Dashboard
Open Work Orders
6
3 urgent ↑
Yarn on Hand (kg)
3,500.0
Active warehouse stock
Sizing Chemical / Greige WH
2 rolls
Stored greige fabric
Coverage (days)
6.4
vs 5-day target ✓
Production orders — active & planned
PO # Article Construction / Detail Qty (m) Start Due Yarn req (kg) Status
WO-2601 Art-112A 140/70D PES Plain 8,400 May 08 May 13 920 In Weaving
WO-2602 Art-085B 100D/100D Twill 2×2 6,200 May 09 May 14 710 In Sizing
WO-2603 Art-230C 75D Nylon Satin 5,000 May 11 May 16 530 Planned
WO-2604 Art-045A 300D Oxford PES 11,000 May 12 May 19 1,240 Planned
WO-2605 Art-310D 150D Microfibre 7,600 May 13 May 20 840 Mat. Short
WO-2606 Art-190E 210D Rip-Stop Nylon 4,800 May 15 May 22 510 Planned
Material requirements vs. stock
PES 140D Warp
OK
PES 100D Fill
Low
Nylon 75D
OK
PES 300D Oxford
Short
Micro 150D
Short
Purchase orders & inbound
PO Ref Material Qty (kg) ETA Status
PUR-441 PES 300D 2,400 May 11 Transit
PUR-442 Micro 150D 1,800 May 12 Transit
PUR-443 PES 100D 1,200 May 14 Confirmed
PUR-444 PVA sizing 600 L May 13 Confirmed
Live floor status
Live · updated now
STATION 01
🧵 Preparation / Sizing
81% OEE
Warping active
Sizer #1 - creel change
STATION 02
⚙️ Weaving Looms
40% OEE
2 looms running
0 cuts rejected
STATION 03
📋 Fabric QC
94% OEE
1 pending inspection
0 cuts logged today
STATION 04
🏬 Warehouse
99% OEE
2 rolls in Greige WH
Stock approved: 0
⚙️ Telares en Producción — Metros Reportados Gestionar telares
Telar Artículo Mi 17/06 Ju 18/06 Vi 19/06 Sá 20/06 Do 21/06 HOY Ma 23/06 Mi 24/06 Ju 25/06 Vi 26/06 Sá 27/06
TELAR-01 ART-SPORT-SHIELD 295 299 307 281 293 300
TELAR-02 ART-SPORT-SHIELD 296 306 282 298 297 291
Total 591 605 589 579 590 591
🎨 Tintorería — Planning Ver planning
HOY
06
12
18
24
Ma 23/06
06
12
18
24
Mi 24/06
06
12
18
24
Ju 25/06
06
12
18
24
Vi 26/06
06
12
18
24
Sá 27/06
06
12
18
24
Do 28/06
06
12
18
24
Atmospheric 01
NOW
B006
15.0h
Atmospheric 02
NOW
HT Dyeing 01
NOW
B001
12.0h
Urgent customer batch.
B002
10.0h
Cotton fabric dyeing.
B003
14.5h
Polyester blend batch.
HT Dyeing 02
NOW
B004
8.0h
High priority.
B005
16.0h
Thies 1
NOW
Thies 2
NOW
Thies 3
NOW
Tongeng
NOW
📋 Cortes de Producción
Período:
3 rollos 600 m 84 kg A: 0 B: 0 R: 0 (0%) ⏳ Pend. QC: 1 (33.3%)
Clave Artículo Partida Telar Metros Kg QC Fecha
3232 ART-SPORT-SHIELD PART-2026-001 TELAR-01 195.0 m PEND 2026-06-20 Inspeccionar
3230 ART-SPORT-SHIELD PART-2026-001 TELAR-01 200.0 m 41.5 kg APPROVED_A 2026-06-19
3231 ART-SPORT-SHIELD PART-2026-001 TELAR-02 205.0 m 42.8 kg APPROVED_B 2026-06-19
Bill of materials — Art-112A (140/70D PES Plain, 1000 m finished)
Level Component Type Qty / 1000 m Unit Scrap % Gross req. Source
L1 Fabric roll — grey Semi-finish 1,000 m 1,000 m Weaving
L2 Warp beam (sized) Intermediate 102 kg 2% 104.0 kg Sizing
L3 PES 140D yarn — warp Raw mat. 100 kg 1% 101.0 kg Purchase
L3 Starch size Chemical 6 kg 5% 6.3 kg Purchase
L3 PVA size Chemical 2 L 5% 2.1 L Purchase
L2 Filling yarn (direct) Raw mat. 9 kg 3% 9.3 kg Purchase
L2 Loom time Capacity 14 hours 14 h Internal
Scrap factors applied at each level. Gross req = net × (1 + scrap%). Warping scrap embedded in L2 beam qty.
Warper utilisation
74%
2 of 3 active
Loom utilisation
40%
2 of 5 active looms
QC throughput
94%
0 cuts logged today
Loom grid assignment (5 machines)
01
02
03
04
05
Running Idle / Unassigned
Workcentre capacity — week 20 (Mon–Fri, 3 shifts)
Warper #1
80%
Sizer #1
82%
Looms Group A
90%
Looms Group B
83%